another electrician asked me and I didn't know the answer but knew where to find it:
existing wire trough on commercial building. tapped in to power co supply on trough and nippled to 400 a meter base. came off load side of meter back into trough and nippled back up into 400a disconnect. passed inspection but Ga. Power wouldn't energize, asked electrican to run conduit from meter base to disconnect so that the conductors didn't run back through trough (line to meter base and load from meter base in separate raceways).
The question is, NEC? or poco requirement?
thank you
existing wire trough on commercial building. tapped in to power co supply on trough and nippled to 400 a meter base. came off load side of meter back into trough and nippled back up into 400a disconnect. passed inspection but Ga. Power wouldn't energize, asked electrican to run conduit from meter base to disconnect so that the conductors didn't run back through trough (line to meter base and load from meter base in separate raceways).
The question is, NEC? or poco requirement?
thank you