PurpleHaze
Member
- Location
- Raleigh, NC
Does the NEC require a non-utility transformer (separately dervice system) inside a building to have a service rated disconnect / overcurrent device. For example would a 100A main circuit breaker panelboard on the secondary of a 30kVA transformer be required to be marked as "Suitable for use as Service Entrance" or have some other service rating?