So, here is a copy of an e-mail I received requesting an Estmate:
"I am looking for best price available. Electrical work as per below: Install a 120volt sub panel in the unfinished area using the existing SEU cable for furnace, refeed furnace Basement Office: Add (3) AFCI protected receptacles Basement Office Closet: Add wiring for (1) fixture with (1) switch and AFCI protection. Customer will provide fixture. Unfinished Area: Add (1) 20amp120volt GFCI circuit for freezer and (1) 20amp/120volt GFCI receptacle for the sump pump"
If they indeed want a sub using the SEU does it not appear that all of the additions would be on one circuit? I have not seen the SEU yet but this just does not look right. Any thoughts?
"I am looking for best price available. Electrical work as per below: Install a 120volt sub panel in the unfinished area using the existing SEU cable for furnace, refeed furnace Basement Office: Add (3) AFCI protected receptacles Basement Office Closet: Add wiring for (1) fixture with (1) switch and AFCI protection. Customer will provide fixture. Unfinished Area: Add (1) 20amp120volt GFCI circuit for freezer and (1) 20amp/120volt GFCI receptacle for the sump pump"
If they indeed want a sub using the SEU does it not appear that all of the additions would be on one circuit? I have not seen the SEU yet but this just does not look right. Any thoughts?