I had a customer request to install a new 2000A 480/277v service. They are wanting to run the secondary conduit overhead to the new gear.
From past experiences underground or concrete encased is the only way I’ve done this.
Is there an acceptable method to run secondary from the utility transformer to the gear overhead in conduit? This is about a 100’ run.
Sent from my iPhone using Tapatalk
From past experiences underground or concrete encased is the only way I’ve done this.
Is there an acceptable method to run secondary from the utility transformer to the gear overhead in conduit? This is about a 100’ run.
Sent from my iPhone using Tapatalk