Would not a walk in cooler that has been delivered to a job site in pieces, be required to be listed as an entire unit? Thanks.
Are walk in coolers required to be listed by some document or standard? This is the electrical forum, so..... are you saying you think that NEC has something to say about this?Would not a walk in cooler that has been delivered to a job site in pieces, be required to be listed as an entire unit? Thanks.
No. A walk in cooler is just something that gets built.Would not a walk in cooler that has been delivered to a job site in pieces, be required to be listed as an entire unit? Thanks.
Thanks. Makes sense. Components required to be listed.No. A walk in cooler is just something that gets built.