cottora
Senior Member
- Location
- Atlanta, GA
An update for those that have been following along (and thanks again for the help!). The county has accepted utilizing a factory-installed externally mounted discount arm on our pad-mounted 1MVA transformer as the building disconnect (solved the six-throws issue).
We now plan on installing nine 400 amp 3-phase 208v panels down the container (see conceptual renderings). We originally were going to install PDUs; however, we came across a UL approved mining unit in which they directly wired the power cord to the panel (see below pic). Is such wiring acceptable? Thanks



We now plan on installing nine 400 amp 3-phase 208v panels down the container (see conceptual renderings). We originally were going to install PDUs; however, we came across a UL approved mining unit in which they directly wired the power cord to the panel (see below pic). Is such wiring acceptable? Thanks