I have a situation where the AHJ is requiring that we support (or secure) MC cable under a raised access floor for an office building (open office scenario) at 4.5' intervals. This seems a little excessive for MC cable laying on a concrete floor. This project is under the 2002 NEC and we are using 300.22(C) for the installation of MC cable in an location used for environmental air.
Can someone please help me with a code reference for either having to support/secure the MC or not having to support the MC cable at 4.5' intervals.
Thanks,
-Ed
Can someone please help me with a code reference for either having to support/secure the MC or not having to support the MC cable at 4.5' intervals.
Thanks,
-Ed