I just got written up for using a plastic bushing in the top of a flush mounted residential meter/main with distribution. I am suppose to use each individual KO in the top of the panel with a romex connector. Then Staple each wire within 12" of the top of the panel. They site the article 312-5-(B)
Is the inspector correct?
Is the inspector correct?