I am installing a new subpanel and have to run SER into the top of the main panel. The main panel has a meter at the top with a door panel I cannot remove w/out electric company unlocking it, and then the breakers sit below that with a door panel I can open. So in trying to secure the SER to the knockout with a clamp connector on top of the panel, I am unable to install the locknut inside the panel for this connector because the meter door panel limits access to the area.
My question is, can I just install a snap-in bushing in the knockout, and then secure the SER within 12" from the panel box, or does the cable HAVE TO be secured at the knockout?