SiddMartin
Senior Member
- Location
- PA
2 seperate detached buildings fed from a service disconnect located else where ( 1 triplex feeding building (A), that is tapped and then the triplex continues to feed building (B). I want to know if the triplex is code compliant or if I need to run Quad. This is 2005 code, I believe it is code compliant, if each building is grounded and has a main disconnect. Please ref. NEC art.
Thanks
Thanks