mdgon said:do you know what article that would be I have been looking and can't find it?
cowboyjwc said:It depends on where in the system you are installing the Generator. If it is feeding the full load and then you would treat it like a service. If it is only certain loads then you would treat it like a subpanel.
mdgon said:Putting in a generator and the inspector asked why I installed a separate ground bar for the panel after the transfer switch.
I installed it because the last job the inspector made me put it in.
Is this to code or did I not need to install a separate ground in the panel?