I have confused myself 'checking' my knowledge to the point that now I've confused myself totally.
You have a service entrance panel with a separate bus bar installed in the room to land all the GECs. When you have a subpanel, do you pull your ground from the ground bar in the main panel, or do you take it back to the separate grounding electrode ground bar? Is either acceptable?
You have a service entrance panel with a separate bus bar installed in the room to land all the GECs. When you have a subpanel, do you pull your ground from the ground bar in the main panel, or do you take it back to the separate grounding electrode ground bar? Is either acceptable?