hhsting
Senior Member
- Location
- Glen bunie, md, us
- Occupation
- Junior plan reviewer
I have strip mall with four tenants. Each tenant space is separated by firewall. Each tenant requires about 400A to 200A 208/120V three phase service
By NEC 2014 section 100 of building each tenant space is considered building. So am I correct on assuming that each space is allowed to have its own utility service? So 4 separate utility services feeding each space.
By NEC 2014 section 100 of building each tenant space is considered building. So am I correct on assuming that each space is allowed to have its own utility service? So 4 separate utility services feeding each space.