Separately Derived AC Ststem

Status
Not open for further replies.

jamesoftn

Senior Member
Location
TN
A system is installed with a feeder of 100 amps 480 volts to a transformer. This transformer produces a ground terminal XO and is bonded at the transformer with the GEC. Service to a 200 main is 4/0 for 200 amps and 2 for system bonding jumper. How far can the service conductors go from the transformer till it reaches the 200 main service disconnect in a industrial building or is there a length? Please list code reference as I cannot seem to locate this information.
 