Designing a very small Type 1 hospital EPSS system. The generator is outside, LS, Crit and Equip Branch ATS's in Emergency electrical room in the building. For the 2#14 start (or possibly 4#14 for start/control wiring monitoring as per caterpillar method), does the LS need to be isolated from Crit and Equipment and Critical be isolated from LS and Equipment? These will be run outside so not in MI for the 2 hour rating required under 700.10.
Thanks,
Mike
Thanks,
Mike