NEC 250.30(A)(2) says "Where an equipment bonding jumper.. is run with the derived phase conductors... The NEC handbook has a diagram showing this jumper. My question is - what section of the code requires the equipment bonding jumper? If 250.30(A)(2) says "where" that doesn't imply that it is required? So is it required or not and what section of the NEC says so?