I know this sounds like a stupid question but I will ask it anyway, I have a job where there are two buildings next to each other( they are chapels - mauseloums). The existing building has a 200 amp service. The new building really has no place to put a panel and they would like all the branch ckts to come from the existing panel to feed the new building. Any code problem with this ? Iam looking at article 225 and see no problem. There is about 10 ckts going to the new building. because of the landscaping they would not like to have a panel outside either if they can avoid it. Load and space is no problem .