I know its wrong but I have an inspection to do where the cable between meter and panel that is supposed to "immediatly" go to the panel board does so, however it travels throughan inside partition for about 2 or maybe 4 feet . I have no real issue with this distance but don't like it being in a wall.
What I need is the code reference that sez it needs to be exposed .
Being in a basement utility rm. I could tell them not to drywall it but its still running through the studs,and what happens a week after final inspection????
What I need is the code reference that sez it needs to be exposed .
Being in a basement utility rm. I could tell them not to drywall it but its still running through the studs,and what happens a week after final inspection????