smoke stack lightning
Member
Good sirs, the plan is to upgrade the dwelling to 200A. From the main disconnect at the meter I want to pipe up to the attic and run accross the entire attic to the garage (where the panel is) with 4w SCR aluminum cable.
The question is , where in the code are the adjustiment tables for excessive ambiant heat for SCR cables? Is it safe to say that the insulation is XHHW and it gets treated as such in table 310.16? Or is a special condition because of its multi-conductor assembly?
Thanks for your time
The question is , where in the code are the adjustiment tables for excessive ambiant heat for SCR cables? Is it safe to say that the insulation is XHHW and it gets treated as such in table 310.16? Or is a special condition because of its multi-conductor assembly?