I am still researching the situation since a 5 o'clock phone call, but i have a busy weekend and wanted some input. Thanks, in advance.
Here is the scenario: My boss calls me today after driving 3 hours for a series of generator start-ups. One of the many complications/questions he has run into is that the EC has fed the fascilities (I have never seen the job, but I think it is waste water operations for a new housing development) with an 800 amp service and main disconnecting means (parallel 500s) which then feeds a 400 amp "whole-house" ATS with a single set of 500s. Based on a sight-unseen, 5-minute phone conversation, I could not come up with a valid reason for this setup. He says the specs call for an 800 amp ATS. The system needs to corrected electrically before we can sign-off on the genset and ATS. Apparently everything has passed inspections to this point. Am I missing something that allows an 800 amp disconnect to feed 400 amp ATS and panels?
Here is the scenario: My boss calls me today after driving 3 hours for a series of generator start-ups. One of the many complications/questions he has run into is that the EC has fed the fascilities (I have never seen the job, but I think it is waste water operations for a new housing development) with an 800 amp service and main disconnecting means (parallel 500s) which then feeds a 400 amp "whole-house" ATS with a single set of 500s. Based on a sight-unseen, 5-minute phone conversation, I could not come up with a valid reason for this setup. He says the specs call for an 800 amp ATS. The system needs to corrected electrically before we can sign-off on the genset and ATS. Apparently everything has passed inspections to this point. Am I missing something that allows an 800 amp disconnect to feed 400 amp ATS and panels?