I have a situation where I have to run 8 sets of 500kcmil of service entrance conductors above ground from the transformer into the building where the main service is located. The transformer is about 10' away from the building, which means I have to run the conduits vertical on the exterior wall before penetrating the wall from the top to main switchboard. My concern is that I can not run these conductors without overcurrent protection since they are above ground. Is this a code violation. Any thoughts..!
Thanks,
I have a situation where I have to run 8 sets of 500kcmil of service entrance conductors above ground from the transformer into the building where the main service is located. The transformer is about 10' away from the building, which means I have to run the conduits vertical on the exterior wall before penetrating the wall from the top to main switchboard. My concern is that I can not run these conductors without overcurrent protection since they are above ground. Is this a code violation. Any thoughts..!