I am reviewing a one line diagram for a job I will be starting soon. the residential portion calls out for a 3 phase 1600 amp service feeding the meter pack. the feeders from the utility transformer are 4 - 500 kcmil xhhw (310 amps 1240 amps total) aluminum per phase. My question are the feeders from the utility to the gear required to comply with 240.4(c). Do the feeders and the over current protection need to match each other with no rounding up. The way i read it is does, but my boss seems to think that all that is required for the utility feeders is for them to match the load. any clarification would be appreciated .
thanks
thanks