truck41trouble
Senior Member
- Location
- US
Good evening. I looked at a job replacing a 3 phase 120/208 service at a BK. One thing I noticed was that the conductors from the mast enter the building before the meter for about 3 feet and the meter is on the adjacent outside wall. Both the line and load side of the meter exit through the rear in seperate conduits.
Has anyone ever seen this before?
Sent from my VS987 using Tapatalk
Has anyone ever seen this before?
Sent from my VS987 using Tapatalk