I have a utility company detail showing the service laterals entering a CT cabinet and then continuing on through what could be nonmetalic conduits to the service disconnect. No grounding conductor or bonding of the CT cabinet is shown.
Would this not require a bonding conductor sized per 250.66 run with each set of paralell feeds from the CT can to the bond jumper location in the service disconnect?