What do you see as the code violation? David mentioned to EGC's being too small. How long are the tap conductors to each panel? Panel A is missing a 4th conductor.his appears to a clear code violation to me. Is that correct?
The feeders are more than 25'.What do you see as the code violation? David mentioned to EGC's being too small. How long are the tap conductors to each panel? Panel A is missing a 4th conductor.
The taps are well over 25'.What do you see as the code violation? David mentioned to EGC's being too small. How long are the tap conductors to each panel? Panel A is missing a 4th conductor.
If they are outside the building they can be unlimited length. I don't believe NEC specifically mentions it but most AHJ's probably will let you enter a building as long as you keep amount of conductor inside minimal just like you would do with service conductors.The feeders are more than 25'.