We have a 600 amp single phase service with a self contained meter base feeding (2) separate services in a office building and a storage building. Both services are 200 amp with main breakers. The office service conduit is installed under concrete slab and the storage conduit is outdoors. Both services do not exceed the 3' rule once entering the building. The AHJ requested that the services have a means of disconnect, which we then installed a 600 amp NF switch. Now that the inspection has occured he is requesting overcurrent protection in the disconnect. Is the overcurrent protection required in this case in the disconnect if we have main breakers in the services