I have an existing 208/120 volt wye overhead service drop I am connecting to a 12.4KV, 300KVA, 3 phase Delta pad mounted transformer via a riser located on the utility pole then underground to the pad mounted transformer. I plan on using 3 #2/0, 1 #6 HMF/. 5" conduit from the pad mounted transformer to somewhere on the pole where I will splice in to the service drop. The service drop goes from the weatherhead on the upper wall of the building to the utility pole riser which it traverses down.
The service drop is 4, #2/0 overhead.
I did the calculations and determined the amp rating of cable I need for the secondary underground piece, but am not sure that the underground piece will mate with the service drop ok.
Does anyone know?