At an existing building with 1200A, 480/277VAC service, have been required to remove the owner's 21Kv to 480V transformer(primary voltage service) and replace it with a 1200A meter service board fed from a 480/277V utility service. NEC 250-32(2), for multiple buildings permits the supply conductors to be run without an equipment ground. As the old service conductors do not have an equipment ground and the building service has a zero sequence ground fault system, can the new metered board be added without replacing the service conductors and adding an equipment ground?