gserve
Senior Member
- Location
- New Hampshire
Can I bring the SEC into a small through first and then into the panel? In other words nipple from the back of the meter socket to the through then to the panel. The through is going to be used as a short raceway instead of an LB and LL. If this is a violation please give code article. Thanks