service entrance tap box commercial appl.

Status
Not open for further replies.

hamic

Member
is it code and what article no. to drill a hole in the back of a tap box for multi services directly in the building for grounding electrode condutor to cold water ground before the main water valve? I forgot to say also in a conduit pvc.
 
Last edited:
Tap box

Tap box

its for main service entrance conductor to a main bus tapped on either side are the service disconnects and meters, bolt down bus on either side.
 
service entrance tap

service entrance tap

bolt down bus on either side to Tennents disconnects and meters
 
250.24(A)(1)
250.64(D)(3) ('08 NEC)

You are using a modular setup?

I think this is legal, as long as you are following the manufacturer's instructions, and the POCO rules.
 
hamic said:
is it code and what article no. to drill a hole in the back of a tap box for multi services directly in the building for grounding electrode condutor to cold water ground before the main water valve? I forgot to say also in a conduit pvc.
Can you post a pic of the project??
 
Status
Not open for further replies.
Top