each building will be 6 two story townhouses...by bad design and tight spacing the POCO will come underground to 6 200 amp meters..(3 meters on the right side end unit and 3 on the left)...from each meter will we will run underground in a "bundled" 4/0 AL URD, (3 wires commonly called "sweetbriar") to a 200 amp panel in the garage....is this wire rated for this application ie going directly into the panel....