I have a 400 amp service . I am going to land my 2/0 gec from slab rebar to my neutral bar in mdp .Water pipe ground to neutral bar. Now do I land my bond wire from my bonding bushings on the nuetral bar as well. ( for the metal pipe from ct to mdp)? Or should I do all this at the ct cabinet to the incoming grounded conductor that is bonded to the ct cabinet? What about the 4' gal pipe that comes in from the street? The pipe from the street comes into the building is pvc the changes over when it comes through the slab into the ct.