wildwillie74
Member
hello everyone, I have a question regarding service loads. I recently did a service change on a 2 family house. The service equipment is rated for 400 amps, I did two 100 amp services. The owner now wants to convert the first floor into a pizza place and I would like help on how to do the load calculation. I was also wondering if I have to change the metering equipment or if I can just change the wire and panel on the first floor to 200 amp. All input is appreciated,Thank You