I believe the service panel needs a separate GEC as per 250.32(a), but if the transformer is located inside the building, thereby the GEC will be connected to transformer, for this case do we still need to connect GEC with panel? means that we would have two GECs one to transformer and the other one to the panel.
My first understanding that we have two GECs when the transformer is located indoor, but when i saw a forum discussing the IEC standard, i found post says the US uses TN-C-S AND TN-C systems where any of them has no connection from panel to grounding through the GEC.
My first understanding that we have two GECs when the transformer is located indoor, but when i saw a forum discussing the IEC standard, i found post says the US uses TN-C-S AND TN-C systems where any of them has no connection from panel to grounding through the GEC.