xxj.electricxx
Member
The wires with conduit Between the load side of the utility meter and a Disconnect before it feeds a residential load center is called ______?
Before the disconnect service conductors.
I did not know we made journeymen jump through hoops when they ask a question.
I am inclined to agree, SE conductor between the Meter and Main. Service conductor before the meter, and Main Power Feeder after the main but before any OCPD's.Service enterance
The way the question is worded lead me to believe that it is either a test question or a homework question.
Chris
The wires with conduit Between the load side of the utility meter and disconnect before it feeds a residential load center is called ______?
It's a test that I've seen @ a community trade college that came up with these question with multiple answers: A)Feeders B)Main C)Service drop D)Branch Circuit. My answer would have been "Service Conductors" Since It's before the disconnect. But it wasn't one of the choices. So I have just posted it up to see if anyone out there agree with the same answer as me.
Service enterance