rojay
Senior Member
- Location
- Chicago,IL USA
Apologies if this question has been covered before. I have a CT cabinet with RMC nipples & bonding locknuts installed between the cabinet and my service disconnect switch outside. The neutral in the CT cabinet is isolated from the enclosure. Does the code mandate that I add a neutral to case bond in the CT, or drag supply side bonding jumpers through my RMC nipples from the service disconnect back to the CT enclosure OR are the properly bonded service raceways adequate by themselves?