As mentioned, some POCO's have stricter rules than NEC on this, so check with them.

But IIRC NEC doesn't necessarily require RMC - just that it be sufficient strength to handle the mechanical load imposed on it.

Transition to a different raceway type often isn't worth the effort compared to sticking with the same thing for the entire run though - those runs are usually somewhat short in length.
 