We have started bidding repairs for these 203k mortgage homes. The first bid was straight forward, but this second house is unusual for me.
The house has a 200 amp FPE on the outside wall of a walk-in closet that needs upgrading. There is a meter base on the other side of the wall with a meter jumper plate that jumpers from Line to Load. The riser has 4/0 AL to the weather head, connected to a triplex. The triplex connect to a pole with another riser having Line/load conductors and a meter base.
I am bidding to relocate the panel by placing it outside and converting the FPE to a j-box and replacing the 4/0 AL. However, I'm not sure about the line/load portion of the pole riser. I know that it's not a disco, but will I need to run 4 wire aerial from the pole to the house? Should I just contact the poco about moving the meter base to the house?
Any advise would be appreciated.
michael
The house has a 200 amp FPE on the outside wall of a walk-in closet that needs upgrading. There is a meter base on the other side of the wall with a meter jumper plate that jumpers from Line to Load. The riser has 4/0 AL to the weather head, connected to a triplex. The triplex connect to a pole with another riser having Line/load conductors and a meter base.
I am bidding to relocate the panel by placing it outside and converting the FPE to a j-box and replacing the 4/0 AL. However, I'm not sure about the line/load portion of the pole riser. I know that it's not a disco, but will I need to run 4 wire aerial from the pole to the house? Should I just contact the poco about moving the meter base to the house?
Any advise would be appreciated.
michael