I am bidding a job to install a new service to a step-up transformer (240/460). This transformer feeds a industrial machine. How do I size the conductors? Like a service to the disconnect and then like a motor after the disconnect? These are my calculations: 30KVA transformer, 175amp fuses at the service, 2/0 CU to the disconnect, #3 CU to the transformer, #6 CU to the machine
(The machine disconnect has 50amp, 600v fuses. (1)20HP, (1)1-1/2HP, (2)1HP motors ).