Hey guys, I own a three family house in RI, and I want to install a 200 amp service for the first floor, 100 amp for second floor, 100 amp for third floor, and 60 amp for a house meter, coming from one service drop perhaps with 300 kcmil wire for 240/120V single phase.
It is possible to do this going to a wire trough before hitting all the meters, or it's not possible?
Thank you guys,
 
Is the first floor commercial? Why the need for 200 amps?

If so, you will need lever bypass for it and the house meter. I would do this with modular metering, otherwise the trough method will look like an abomination and be a lot more labor intensive.
 