Chuck Greenberg

New User
Location
Richmond Va.
Occupation
Service manager
Getting ready to upgrade a 400 amp single phase 240 volt residential service to a 600 amp single phase 240 volt service. We are going to run 2 sets of 500 mcm aluminum in parallel feeders to 3 two hundred amp main service overcurrent switch disconnects. Looking to run in a schedule 80 PVC conduit. Looking for proper size pipe.
 
I am closing this thread in accordance with forum rules. This forum is intended for use by electricians and electrical contractors, inspectors, engineers, and vendors with their job-related duties. We are not allowed to provide how-to advice to persons who are not employed in this industry, or persons who do not perform electrical installation or maintenance as part of their jobs.
 