my question is we have one transformer and we are serving 4 buildings
we are having one c/t cabinet either at the transformer or our at the closest building, and then going to each of the four buildings before the trough we want to have our main to the trough then our four tenants. i am looking at section 230 am i right to have one c/t by the transformer and the the main at each building trought
these are dwelling units
any help thanks as always
we are having one c/t cabinet either at the transformer or our at the closest building, and then going to each of the four buildings before the trough we want to have our main to the trough then our four tenants. i am looking at section 230 am i right to have one c/t by the transformer and the the main at each building trought
these are dwelling units
any help thanks as always