An 800 amp overhead service needs to supply one 400 amp c/t cabinet and a meter bank of five meters. Instead of a tap box between the c/t
cabinet and the meter enclosure (five meters), could I keep the meter bank and c/t next to each other but not mechanically connected (no tap box).
The c/t and the meter bank would each have their
own 3" riser, both of which would meet at, and be
attached to the same service drop.
Each meter will have a 100A CB on load side for
feeder and c/t will feed a panel board with main
with in five feet.
Is this considered a single service for the
building?
cabinet and the meter enclosure (five meters), could I keep the meter bank and c/t next to each other but not mechanically connected (no tap box).
The c/t and the meter bank would each have their
own 3" riser, both of which would meet at, and be
attached to the same service drop.
Each meter will have a 100A CB on load side for
feeder and c/t will feed a panel board with main
with in five feet.
Is this considered a single service for the
building?