We are installing two, 200A service drops on a single pole (back to back). The installations will have each their own weather head, meter, and service disconnect. These are temporary services to provide power to multiple jobsite office trailers. I'm reviewing NEC 250.64 to determine if I can share the ground rods between these two services, but nothing is jumping out at me. Have any of you ran into this situation before?