I have a generator to install and have seen this done both ways. I would like to know the right way... From the generator to the transfer switch i will have the Emergency power, Control circuits and utility sensing circuits. How many conduits will i need. I have seen it done with 2 or 3 raceways. In my opinion it should be 3
(1 for em power, 1 for the 24v control circuits and 1 for the utility sensing circuits. am I wrong for thinking this way? thank you for your awnsers in advance.
(1 for em power, 1 for the 24v control circuits and 1 for the utility sensing circuits. am I wrong for thinking this way? thank you for your awnsers in advance.