Short Circuit Current at terminal of Utilities service Transformer

Status
Not open for further replies.

Piramyd

Member
Hi There

I am working at a new custom house construction electrical installation.
I am planning to install a Siemens Solar Ready panel which include a meter socket, one CB for PV and two 200 A CB for Grid Power. I am planning to install 2 subpanel.
My question is regarding the short circuit current available at meter socket.
It is my first time doing this part of electrical installation and I really need to know who will tell me the short circuit current available at meter socket, if Nevada Energy in this case or using the point-to-point calculation and considering infinite primary current ? On the other hand I applied for permanent power but I do not know which is the Secondary KVA of Nevada Energy at the job site.
Thank you very much for any help.:happysad:
 