danselectricalcontracting
Member
- Location
- Irvine
- Occupation
- electrical contractor
the wires coming into the main service panel from Edison are too short for any replacement panel I can find. the wires are 9 inches and new terminal/lug location requires at least 15 inches to accommodate. will Edison replace those wires or am I responsible as the contractor?