I'm working on a project that includes a 125A main breaker feeding a Siemens imaging piece of equipment albeit via two paths; 1) via a UPS and one a direct connection to the Equipment branch of the hospital. Siemens requires an EPO to shunt trip the breaker and to connect into the EPO point on the UPS (which happens to be a PowerWare (Eaton) 9390, 40kVA. Not sure what to provide for control power. Will check with PowerWare rep. But does anyone have any experience with these?
Thanks,
Mike
Thanks,
Mike