mdshunk
Senior Member
- Location
- Right here.
I was just looking over the installation sheet for a GE shunt trip accessory. I was surprised to find that it says:
NOTE: Any work requiring cover removal of a sealed
breaker voids UL Listing. The UL label must be de-
stroyed.
Never really noticed that before. I think the lion's share of all shunt trip breakers I've ever installed, I put in the shunt trip accessory myself. I'm sorry to read that, since the lead time for a breaker with the shunt trip installed at the factory can be a good while.
Here's the PDF I'm talking about, from GE:
http://www.geindustrial.com/publibrary/checkout/Installation and Instruction|GEH-3416|PDF
NOTE: Any work requiring cover removal of a sealed
breaker voids UL Listing. The UL label must be de-
stroyed.
Never really noticed that before. I think the lion's share of all shunt trip breakers I've ever installed, I put in the shunt trip accessory myself. I'm sorry to read that, since the lead time for a breaker with the shunt trip installed at the factory can be a good while.
Here's the PDF I'm talking about, from GE:
http://www.geindustrial.com/publibrary/checkout/Installation and Instruction|GEH-3416|PDF