dtslandreth
Member
I have to feed a 120/208V 3 phase, 200 amp MCB, panel for parking lot lights. Its being fed from a main panel 500' away. What size conductors would I use.
Start with the real load calculation for the lights. It may be less than the 200 Amps for which the panel is rated. Maybe you can get by with less than 400 MCM.dtslandreth said:There is not 277/480. I wish there was. According to my calculation, I need a 400 MCM.